HZS180 Concrete Batching Plant in Uzbekistan

Recently, our company's HZS180 fixed belt concrete mixing station was successfully sent to Tashkent, Uzbekistan, and the installation work was successfully completed.

Equipment Arrival and On-site Guidance

After the concrete mixing station arrived in Tashkent, our after-sales engineer team quickly rushed to the scene to guide the whole installation process. Their experience and expertise ensured the smooth installation.

The steps for installing the concrete mixing station are as follows:

1. Site preparation
Firstly, clean up the construction area to make it flat and free of sundries. In addition, the fixed batching plant usually needs to lay the foundation, so the design scheme should be followed when laying the foundation.

2. Installation of main equipment
Hoist the main equipment in place and install it according to the installation drawing, paying attention to the correct sequence, position and height to ensure that all components are installed correctly.

3. Pipe connection
Install all pipes and fittings on the equipment as shown in the design drawing, and fix them with bolts. After installation, check whether there is any leakage.

4. Electrical system installation
Set up electrical system bracket and install equipment. Then, connect the wires and cables according to the electrical diagram. Test the electrical system and adjust it as needed.

5. Debugging
Test and adjust the mixing station according to the equipment manual. Carry out trial operation to verify its normal operation and ensure that it produces concrete that meets the standards.

Installation Completed

The installation work will be completed within 35 days. During this period, our engineers conducted a comprehensive training for the field staff. This ensures that the staff can master the operation procedures of the equipment and ensure the safe operation of the concrete mixing station.